January 1, 1973 Project duration: January 1973 – January 1985. (Devtec Nepal joined this project since January 1983) The initials phase involved a feasibility study of several alternatives roads networks giving access to…
January 1, 1973 Project duration: January 1973 – January 1985. (Devtec Nepal joined this project since January 1983) The longest of four major bridges on an 80 km long highway construction project under construction…
December 1, 1976 Project duration: December 1976 – 1986. (Devtec Nepal joined this project since January 1983) Airfield Pavements: Completed consulting services were provided for the rehabilitation of existing runway, taxiway and aircraft apron…
October 1, 1980 Project duration: October 1980 – June 1983. (Devtec Nepal joined this project since January 1983) In 1976 the National Construction Company of Nepal (NCCN) was awarded a contract with a value…
January 6, 1983 Project duration: 1983 – 1989. A Preliminary engineering report was prepared complete with cost estimates covering the economic feasibility of replacing obsolete single-lane bridges on Raxaul-Kathmandu Highway. Nineteen possible bridges…
September 1, 1985 Project duration: September 1985 – October 1994. The Kohalpur-Mahakali Highway Project is located in the Mid Western and Far Western Development Regions of Nepal. The highway runs approximately east to…
October 1, 1985 Project duration: October 1985 – March 1986. Traffic forecasts for Third Country and India Bilateral trade, economics, cost and financial analyses; warehousing, ports and trucking facilities design; international documentation; and…
January 1, 1986 Project duration: January 1986 – March 1986. At the request of Asian Development Bank, Manila, DEVTEC prepared the city maps of Kathmandu at scale of 1:10000 scale and Patan at…
February 1, 1986 Project duration: February 1986 – June 1986. The Rapti Area Development Project (367-0219) was implemented in 1980 following the agreement between the USAID/Nepal and His Majesty’s Government of Nepal (HMG/Nepal)….
May 1, 1986 Project duration: May 1986 – October 1990. The area covered by these maps lies within the Kathmandu Ring Road. In these maps, the important places and offices of government and…
July 18, 1986 Project duration: July 18, 1986 – July 17 1987. As per the contract DEVTEC alone provided three Financial Managers for three different stations (project areas) who maintained the project accounts,…
September 1, 1986 Project duration: September 1986 – September 1986. The study was done for Winrock International to investigate and recommend the existing power supply system in Rampur agriculture Campus and Parwanipur Agriculture…
November 6, 1986 Project duration: November 1986 – April 1987. The object of the study is to find out the economic and employment status of the women labours who are trained by DVCI….
February 27, 1987 Project duration: February 27 1987 – December 7 1989. This is a comprehensive resource inventories of the 229 village and one town panchayat of five districts of Rapti Zone. The…
March 1, 1987 Project duration: March 1987 – April 1987. Traffic forecasts for Third Country and India Bilateral trade, economics, cost and financial analyses; warehousing, ports and trucking facilities design; international documentation; and…
June 1, 1987 Project duration: June 1987 – December 1989. Landscaping Expert (Architect) and Flowerish: Designing, Planning, Management and Execution. Detailed designing of the specified areas of the Tribhuwan International Airport where the…
October 1, 1987 Project duration: October 1987 – December 1987. This study was assign to the Tropical Research & Development Inc. and Devtec was associated as a local consulting Firm. The study objective…
January 1, 1988 Project duration: January 1988 – July 1988. This was a detail feasibility survey and design study of 22 km of forest road near the Nepal India boarder in Central Development…
January 1, 1988 Projet duration: January 1988 – September 1988. This was a technical assistance project financed by the World Bank. The study was assigned to a BCEOM, France and Devtec Nepal Pvt….
February 1, 1988 Project duration: February 1988 – July 1988. Department for International Development (DFID), U.K. had provided grant assistance to HMG/Nepal for road maintenance skill development program through Department of Roads. The…
March 1, 1988 Project duration: March 1988 – August 1988. The proposed project irrigates net 65 ha of land in Baitadi District of Mahakali Zone. Detailed feasibility, including survey and design works were…
March 1, 1988 Project duration: March 1988 – July 1988. The Department of Transport awarded the work of evaluation of the existing major Bus Parks of TEN important cities of Nepal i.e. Butwal…
June 1, 1988 Project duration: June 1988 – August 1988. The USAID/Nepal had assigned two International Consultants of Colorado State University USA, to prepare a reassessment report on food aid as a development…
September 1, 1988 Project duration: September 1988 – January 1989. JICA/Nepal
October 1, 1988 Project duration: October 1988 – 1990 The services provided were: Topographic survey, traffic studies, hydrological study, geo-technical investigations, and socio-economic analysis including engineering survey and cost estimate. The assignment was…
November 1, 1988 Project duration: November 1988 – March 1989. Assist Canadian Corporation Office (CCO) Kathmandu in survey, design, cost estimate, preparation of tender documents, bid evaluation, construction, monitoring and supervision works of…
December 1, 1988 Project duration: December 1988 – June 1989. The overall objective of this study is to analyses the food production and self-sufficiency situation in Jumla District and to examine the possibilities…
January 1, 1989 Project duration: January 1989 – August 1989. The above project was awarded to Devtec by Department of Irrigation Feasibility Study Project Office. The project TOR comprises detailed survey, design and…
January 1, 1989 Project duration: January 1989 – August 1989. Based on the requests received by DOI, detailed feasibility survey, design and cost of the scheme were prepared. The eagerness of the beneficiaries…
February 1, 1989 Project duration: February 1989 – July 1989. The Department of Transport awarded the work of evaluation of the existing major Bus Parks of TEN important cities of Nepal i:e. Butwal…
February 1, 1989 Project duration: February 1989 – August 1989. This is a detailed survey and design work of about 6.0 km of the Terai Road in the existing Tea Garden of the…
February 1, 1989 Project duration: February 1989 – August 1989. Devtec conducted the detail survey design and cost estimate of this road project. This is an excess road linking the district headquarter of…
March 1, 1989 Project duration: March 1989 – August 1989. District Forest Office, Dhanusa
March 1, 1989 Project duration: March 1989 – August 1989. District Forest Office, Dhanusa
March 12, 1989 Project duration: March 1989 – December 1989. Survey of different custom posts and their existing warehouse location, facilities, approach, import and export data, office buildings and area etc. for future…
July 1, 1989 Project duration: July 1989 – December 1989. HMGN, Ministry of Water Resources, Ground Water Resource Development Project also supported by UNDP/World Bank had established its branch offices in different districts…
September 1, 1989 Project duration: September 1989 – November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…
September 1, 1989 Project duration: September 1989 – November 1990. Proposed Irrigation Project was surveyed by the team with an objective to provide the social, technical and economic aspects of an Irrigation System…
September 1, 1989 Project duration: September 1989 – November 1990. Proposed Irrigation Project was surveyed by the team with an objective to provide the social, technical and economic aspects of an Irrigation System…
September 1, 1989 Project duration: September 1989 – November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…
September 1, 1989 Project duration: September 1989 – November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…
September 1, 1989 Project duration: September 1989 – November 1990. The object of the study was to rehabilitate the existing system for better use of the available water resource for agricultural production.
September 1, 1989 Project duration: September 1989 – November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…
September 1, 1989 Project duration: September 1989 – November 1990. Proposed Irrigation Project was surveyed by the team with an objective to provide the social, technical and economic aspects of an Irrigation System….
September 1, 1989 Project duration: September 1989 – November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…
September 1, 1989 Project duration: September 1989 – March 1991. The Canadian International Development Agency (CIDA) had provided technical assistance to Nepal for establishment of Community Medical Auxiliary Training Campus and six health…
November 1, 1989 Project duration: November 1989 – January 1990. This is an assessment study of the irrigation system having command areas of 350 ha (net) with a total population 469 Both technical…
January 1, 1990 Project duration: January 1990 – June 1991. The overall goal of the Karnali-Bheri Integrated Rural Development Project (K-BIRD) was to increase and enhance self-initiated and sustainable economic, environmental and social…
February 1, 1990 Project duration: February 1990 – August 1991. The overall goal of the Karnali-Bheri Integrated Rural Development Project (K-BIRD) was to increase and enhance self-initiated and sustainable economic, environmental and social…
February 1, 1990 Project duration: February 1990 – March 1990. HMGN, Ministry of Water Resources, Ground Water Resource Development Project also supported by UNDP/World Bank had established its branch offices in different districts…
April 1, 1990 Project duration: April 1990 – January 1991. The Asian Development Bank TA project aims to review fertilizer policies at all stage of Supply and demand and ro recommend planning system…
June 1, 1990 Project duration: June 1990 – July 1990. HMGN, Ministry of Water Resources, Ground Water Resource Development Project also supported by UNDP/World Bank had established its branch offices in different districts…
October 1, 1990 Project duration: October 1990 – May 1991. The Study has attempted to provide assistance to the DDC Planning Office, Dhankuta District in order to prepare a sound integrated multi-sectoral planning…
January 1, 1991 Project duration: January 1991 – December 1992. The Asian Development Bank has been involved for more than 10 years in the Rural Water Supply and Sanitation Sector in Nepal, providing…
February 1, 1991 Project duration: February 1991 – March 1991. This was an appraisal survey of the two HMG funded schemes managed by the local people. The main objectives of the appraisal survey…
February 1, 1991 Project duration: February 1991 – June 1995. The USAID/Nepal had provided a grant assistance of US $ 4.0 million to implement the Forestry Development programme in various districts of Nepal…
March 1, 1991 Project duration: March 1991 – April 1991. Ground Water Resource Development Program was established by HMG/N to provide and facilitate the rural population with sustainable ground water resources to be…
May 1, 1991 Project duration: May 1991 – June 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…
June 1, 1991 Project duration: June 1991 – October 1991. The main aim and objective of the study was to provide sustainable groundwater irrigation facilities to the local farmers of the area by…
October 1, 1991 Project duration: October 1991 – November 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…
October 1, 1991 Project duration: October 1991 – November 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…
November 1, 1991 Project duration: November 1991 – July 1992. This is an assessment and evaluation study of Nepal Forestry Sector Development activities assisted by International Banks, Bilateral Agencies and donnas countries. The…
November 1, 1991 Project duration: November 1991 – December 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…
November 1, 1991 Project duration: November 1991 – December 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…
November 1, 1991 Project duration: November 1991 – December 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…
November 1, 1991 Project duration: November 1991 – October 1992. This was Technical Assistance Project funded by the French Government. It was a multi-sectoral integrated rural development project implemented in Gulmi and Arghakhanchi…
December 1, 1991 Project duration: December 1991 – January 1992. Nepal being landlocked country, it feels the need of moderaisation of Nepal’s present transit traffic. One of the objectives of the study is…
January 1, 1992 Project duration: January 1992 – May 1992. Under the agricultural development assistance program of the USAID to Nepal, the part of the funding was use to prepare “A Financial and…
May 1, 1992 Project duration: May 1992 – October 1995. The Project may be viewed as four separate but related parts in tow phases, with the common overall objective of introducing systematic and…
May 1, 1992 Project duration: May 1992 – July 1992. This was an evaluation study of community development component of Drinking water and Irrigation project of Surkhet district. Main objective of the study…
May 1, 1992 Project duration: May 1992 – July 1992. Declaration of UN for Women as “Intergation of Women in Development a Equal partner with Man” was the due realization to assess and…
May 1, 1992 Project duration: May 1992 – July 1992. The overall goal of the Karnali-Bheri Integrated Rural Development Project (K-BIRD) was to increase and enhance self-initiated and sustainable economic, environmental and social…
July 1, 1992 Project duration: July 1992 – April 1993. A study was carried out to determine the technical and economic feasibility of replacing 6 already constructed, and 8 proposed floodways structures on…
December 1, 1992 Project duration: December 1992 – February 1993. The Department of Roads (ROAD) of Ministry of Works and Transport assigned Economic Studies Group of Render Palmer and Triton from UK in…
January 1, 1993 Project duration: January 1993 – July 1993. SBPP/GTZ
February 1, 1993 Project duration: February 1993 – December 1998. Goverment of Neepal Received a Credit from IDA inn various currencies towards the cost of the Engineering Education Project. In this respect the…
December 1, 1993 Project duration: December 1993 – April 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
December 1, 1993 Project duration: December 1993 – September 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
December 1, 1993 Project duration: December 1993 – September 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
December 1, 1993 Project duration: December 1993 – September 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
December 1, 1993 Project duration: December 1993 – September 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
December 1, 1993 Project duration: December 1993 – April 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
December 1, 1993 Project duration: December 1993 – September 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
December 20, 1993 Project duration: 20 December 1993 – 20 March 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by…
January 1, 1994 Project duration: January 1994 – February 1994. Ministry of Finance/ HMG/ Nepal
May 1, 1994 Project duration: May 1994 – December 1995. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
July 1, 1994 Project duration: July 1994 – November 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
October 1, 1994 Project duration: October 1994 – March 1995. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
December 18, 1994 Project duration: 18 December 1994 – December 1996. As a result of Limited International invitation to bid , crown agent/devtec have successfully appointed to act as procurement agent in the…
January 1, 1995 Project duration: January 1995 – December 1995. The USAID had provided financial assistance to HMG/Nepal for development of Flower Nursery production and marketing in and out side Nepal. As a…
March 1, 1995 Project duration: March 1995 – December 1995. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
March 1, 1995 Project duration: March 1995 – January 1996. Department for International Development (DFID), U.K. had provided grant assistance to HMG/Nepal for road maintenance skill development program through Department of Roads. The…
March 1, 1995 Project duration: March 1995 – March 1995. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
March 1, 1995 Project duration: March 1995 – March 1995. This is the part of the JAKPAS program with an objective to provide technology support and training to Support Organizations (SOs) mostly NGOs…
March 1, 1995 Project duration: March 1995 – June 1995. Data from the four different bridge sites were collected for a detailed feasibility study of the bridge projects located at different districts of…
March 1, 1995 Project duration: March 1995 – December 2002. Number of users supported: Depends upon Oracle Version Brief description of technical environment: dBase on Novel Netware, also developed in Oracle 8i /…
April 1, 1995 Project duration: April 1995 – December 1995. Talku – Kulekhani Road is envisaged as motorable village level link road project beginning from Kulekhani VDC of Makawanpur district ending at Sesh…
May 1, 1995 Project duration: May 1995 – June 1995. USAID had provided assistance to HMG/Nepal to develop and strengthen the forest and forest related activities in Nepal. The main objective was to…
May 1, 1995 Project duration: May 1995 – December 1995. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…
June 1, 1995 Project duration: June 1995 – August 1995. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the Janata Ko Khane Pani Ra Safai Karya kram (JAKPAS) Project, is…
November 1, 1995 Project duration: November 1995 – June 1999. The Road Maintenance and Rehabilitation Project (RMRP) is part of the World Bank/IDA funded Fourth Highway Loan for Nepal. For the first time,…
January 1, 1996 Project duration: January 1996 – August 1996. All 75 districts, 14 zonal, and 5 regional maps had been digitized through AUTOCAD software so that the various features of the planning…
January 1, 1996 Project duration:1 January 1996 – 30 March 1996. The Asian Development Bank has been involved for more than 10 years in the Rural Water Supply and Sanitation Sector in Nepal,…
May 1, 1996 Project duration: May 1996 – June 1996. British Gorkha Transit Camp
July 1, 1996 Project duration: July 1996 – August 1996. 1. Introduction of the Course – Review of planning in Nepal with reference to the development projects. – Why development project fail in…
July 1, 1996 Project duration: July 1996 – September 1996. Various concepts of privatization were examined with a view to formulate a board national policy on the basis of analysis the shortcoming the…
September 1, 1996 Project duration: 1 September 1996 – 12 September 1996. – Inventory management – Time and stress management – Preparation of action plan guidelines – Computer interface orientation – Personal action…
February 1, 1997 Project duration: February 1997 – December 1997. After the design of access road to Chameliya Hydroelectric Project, NEPECON/DEVTEC also assigned to conduct Preliminary investigation, site selection, hydrological analysis, detailed Survey,…
April 17, 1997 Project duration: 17 April 1997 – 15 June 1997. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
April 25, 1997 Project duration: 25 April 1997 – 9 May 1997. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
June 1, 1997 Project duration: 1 June 1997 – 13 June 1997. DEVTEC had organized the EIA Training to develop the skills of the experts working in forestry environment sector of Nepal. The…
August 1, 1997 Project duration: August 1997 – February 1998. BELTRONIX Conduct the pre-service entrance training programme to Beltronix Staff.
September 15, 1997 Project duration: 15 September 1997 – 28 September 1997. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and Sanitation…
September 17, 1997 Project duration: 17 September 1997 – 24 October 1997. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
October 1, 1997 Project duration: October 1997 – March 1998. Due to the haphazardly expanded cities of country it was necessary for planning city to meet the technical as well as the managerial…
November 1, 1997 Project duration: November 1997 – May 1998. The objective of the TA was to assist the Asian Development Bank and Government of Nepal in formulating a rural finance project that…
January 1, 1998 Project duration: January 1998 – October 1998. This Project was confined principally to the distribution sector of Nepal Electricity Authority (NEA) and covers a broad range of activities focused principally…
March 26, 1998 Project duration: 26 March 1998 – November 1998. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and Sanitation…
March 29, 1998 Project duration: 29 March 1998 – 28 November 1998. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
June 15, 1998 Project duration: 15 June 1998 – 31 August 1998. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
June 30, 1998 Project duration: 30 June 1998 – 15 June 2000. Department for International Development (DFID), U.K. had provided grant assistance to HMG/Nepal for road maintenance skill development program through Department of…
August 4, 1998 Project duration: 4 August 1998 – 13 August 1998. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
September 18, 1998 Project Duration: September 1998 – October 1998. Evaluation of the Three Options for Operating the Airports on Cost Centre Basis to Enable the Selection of either or New One as…
October 27, 1998 Project duration: 27 October 1998 – 3 January 1999. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
March 1, 1999 Project duration: March 1999 – November 1999. A detailed cartographic survey of electrification status was conducted to prepare the GIS maps of the above said area. Cartographic features, electrical features,…
April 29, 1999 Project duration: 29 April 1999 – 28 January 2000. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
May 9, 1999 Project duration: 9 May 1999 – 29 February 2000. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
June 1, 1999 Project duration : June 1999 – June 1999. Health and Sanitation Education (HSE) program had been included in RWSS schemes as one of the basic components. It is a key…
June 1, 1999 Project duration: June 1999 – August 1999. The Rural Water Supply and Sanitation Fund Development Board (the Board) is implementing a demand led community based Rural Water Supply and Sanitation…
June 9, 1999 Project duration: 9 June 1999 – 11 June 1999. The Rural Water Supply and Sanitation Fund Development Board (the Board) is implementing a demand led community based Rural Water Supply…
June 25, 1999 Project duration: 25 June 1999 – March 2000. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and Sanitation…
July 1, 1999 Project duration: July 1999 – May 2000. The Technical Assistance Study funded by Asian Development Bank, Manila aims to prepare an investment feasibility report, the ensuring investment project will be…
July 21, 1999 Project duration: 21 July 1999 – 30 July 1999. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
August 13, 1999 Project duration: 1st Package – 13 August 1999 – 22 August 1999, 2nd Package – 31 August 1999 – 9 September 1999. The Rural Water Supply and Sanitation Fund Development…
September 4, 1999 Project duration: 4 September 1999 – 17 September 1999. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and Sanitation…
October 1, 1999 Project duration: October 1999 – February 2001. This project was carried out to collect information of electrification status throughout country. Plotting of 11 kV lines, distribution transformers, 33 kV lines and…
January 1, 2000 Project duration: January 2000 – March 2000. Preparation of GIS maps of some districts was carried out by using 1:25000 scale maps as base maps and with objective to convert…
March 31, 2000 Project duration: 31 March 2000 – 31 March 2000. The Rural Water Supply and Sanitation Fund Development Board(RWSSFDB) is implementing a demand led community based Rural Water Supply and Sanitation Project….
April 1, 2000 Project duration: 1st Package – 1 April 2000 – 8 April 2000, 2nd Package – 3 April 2000 – 10 April 2000. The Rural Water Supply and Sanitation Fund Development…
May 1, 2000 Project Duration: 1 May 2000 – 1 June 2001. The activities included: Review of existing studies maps, documents etc. Topographical, geological, geotechnical studies. -Hydrological, meteorological, sedimentological studies. -Layout and design…
May 15, 2000 Project duration: 15 May 2000 – 14 February 2001. Based on the Nepal Environmental Policy and Action Plan 1993, “Environmental Labelling for Export Industries in Nepal’ project is in operation…
May 26, 2000 Project duration: 1st Package – 26 May 2000 – 28 May 2000, 2nd Package – 3 June 2000 – 5 June 2000. – Orient the SA staffs on Fund Board…
July 1, 2000 Project Duration: 1 July 2000 – 1 July 2003. –Systems supplied: Consumer Management & Billing, -Number of users supported: Depends upon Oracle Version -Brief description of technical environment: Oracle 8i…
August 23, 2000 Project duration: 23 August 2000 – 27 September 2000. The objective of this training was to train the Community Technicians (CTs) of the Service Organizations (SOs) working at the community…
August 23, 2000 Project Duration: 23 August 2000 – 27 September 2000. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
September 1, 2000 Project Duration: September 2000 – May 2004. -Systems supplied: Consumer Management and Billing -Number of users supported: Depends upon Oracle Version Brief description of technical environment: Oracle 7 / Developer…
September 5, 2000 Project duration: 5 September 2000 – 22 September 2000. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
September 8, 2000 Project duration: 8 September 2000 – 7 June 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
September 8, 2000 Project duration: 8 September 2000 – 7 June 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
September 8, 2000 Project duration: 8 September 2000 – 7 June 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
September 8, 2000 Project duration: 8 September 2000 – 7 June 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
September 8, 2000 Project duration: 8 September 2000 – 7 June 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
September 8, 2000 Project duration: 8 September 2000 – 7 June 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
September 8, 2000 Project duration: 8 September 2000 – 7 June 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
October 18, 2000 Project Duration: 18 October 2000 – 20 October 2000. Health and Sanitation Education (HSE) program had been included in RWSS schemes as one of the basic components. It is a…
October 18, 2000 Project Duration: 18 October 2000 – 20 October 2000. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
October 18, 2000 Project Duration: 18 October 2000 – 20 October 2000. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
October 21, 2000 Project Duration: 21 October 2000 – 23 October 2000 Health and Sanitation Education (HSE) program had been included in RWSS schemes as one of the basic components. It is a…
October 21, 2000 Project Duration: 21 October 2000 – 23 October 2000. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
October 21, 2000 Project Duration: 21 October 2000 – 23 October 2000. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
December 1, 2000 Project Duration: December 2000 – October 2003. The main objective of the project to develop regional cooperation to develop energy sector involving hydropower, natural gas, energy efficiency, rural electrification, cooperation…
January 18, 2001 Project Duration: 18 January 2001 – 17 October 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
January 18, 2001 Project Duration: 18 January 2001 – 17 October 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
February 20, 2001 Project Duration: 20 February 2001 – 5 March 2001. Health and Sanitation Education (HSE) program had been included in RWSS schemes as one of the basic components. It is a…
February 22, 2001 Project Duration: 22 Feb 2001 – 7 March 2001. Health and Sanitation Education (HSE) program had been included in RWSS schemes as one of the basic components. It is a…
March 11, 2001 Project Duration: 11 March 2001 – 24 March 2001. Health and Sanitation Education (HSE) program had been included in RWSS schemes as one of the basic components. It is a…
March 15, 2001 Project Duration: 15 March 2001 – 19 March 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
April 9, 2001 Project Duration: 9 April 2001 – 18 April 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
April 20, 2001 Project Duration: 20 April 2001 – 29 April 2001. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
July 1, 2001 Project Duration: 1 July 2001 – 31 May 2002. MPE/ESPS, DANIDA
August 10, 2001 Project Duration: 10 August 2001 – 30 March 2002. The main task of the study is to support the ActionAID Nepal to carryout the Review of its education Activities. The…
December 1, 2001 Project Duration: 1 December 2001 – April 2003. Project Study of Benefit Monitoring Evaluation (BME) Report consisting of Pokhara Environment Improvement Project Manaslu Eco-Tourism Project and Six Domestic Airports Upgrading…
January 1, 2002 Project Duration: 1 January 2002 – September 2002. -Systems supplied: Hotel Management System -Number of users supported: Depends upon Oracle Version -Brief description of technical environment: Oracle 8i / Developer…
March 1, 2002 Project Duration: March 2002 – December 2007. To enhance the role of the Nepal Rastra Bank in the overall financial system of the country, it became necessary to think over…
April 15, 2002 Project Duration: 15 April 2002 – 14 Jan 2003. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
April 15, 2002 Project Duration: 15 April 2002 – 14 January 2003. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
April 15, 2002 Project Duration: 15 April 2002 – 14 Jan 2003. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
April 15, 2002 Project Duration: 15 April 2002 – 14 January 2003. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
May 7, 2002 Project Duration: 7 May 2002 – 11 June 2002. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
May 9, 2002 Project Duration: 9 May 2002 – 26 May 2002 . The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply…
August 1, 2002 Project Duration: 1 August 2002 – 30 September 2002. Action AID Nepal
January 1, 2003 Project Duration: January 2003 – July 2005. The Standard Nursery.
April 15, 2003 Project Duration: 15 April 2003 – 14 January 2004. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
August 1, 2003 Project Duration: August 2003 – March 2006. Preparation of a project to help achieve the goal of poverty reduction by improving the earning potential of the country’s youth, and to…
August 1, 2003 Project Duration: August 2003 – December 2003. –Systems supplied: Secured Business Solutions -Number of users supported: Depends upon Oracle Version -Brief description of technical environment: Oracle 8i / Developer 2000…
September 1, 2003 Project Duration: 1 September 2003 – 31 February 2003. The main objectives of the project is the wider dissemination of EASA to sensitise and aware the concerned stakeholders on the…
September 1, 2003 Project Duration: September 2003 – May 2004. Systems supplied: Secured Management System. Number of users supported: Depends upon Oracle Version. Brief description of technical environment: Oracle 8i / Developer 2000…
January 1, 2004 Project Duration: January 2004 – January 2006. The Standard Nursery
March 1, 2004 Project Duration: March 2004 – September 2004. –Number of users supported: Depends upon Oracle Version -Technical environment: Oracle 8i on Windows Advance Server 2000 Secured Business Solution is designed to…
August 4, 2005 Project Duration: August 2005 – November 2005. The overall objective is to identify major environmental issues associated with the proposed project such as: -To reveal positive and negative consequences of…
September 1, 2005 Project Duration: September 2005 – March 2006. Plan Nepal
November 1, 2005 Project Duration: November 2005 – February 2006. EuropeAid//119860/C/SV/multi
June 1, 2006 Project Duration: June 2006 – July 2006. Government of Nepal/WB/Dept of Irrigation
September 1, 2006 Project Duration: September 2006 – November 2006. The Major training contents covered in training and overview of RWSSFDB: its policies, plan, strategies, working modalities, targets and achievements, role of different…
September 1, 2006 Project Duration: September 2006 – October 2007. The overall objective is to identify major environmental issues associated with the proposed project such as: -To reveal positive and negative consequences of…
September 8, 2006 Project Duration: 8 September 2006 – 24 September 2006. The Major training contents covered in training and overview of RWSSFDB: its policies, plan, strategies, working modalities, targets and achievements, role…
September 9, 2006 Project Duration: 9 September 2006 – 25 September 2006. The Major training contents covered in training and overview of RWSSFDB: its policies, plan, strategies, working modalities, targets and achievements, role…
October 11, 2006 Project Duration: 11 October 2006 – 10 September 2008. The overall objective of the TA is to help the Government operationalize and institutionalize Managing for Development Results (MfDR) to implement…
January 1, 2007 Project Duration: 1 January 2007 – 31 December 2009. This package includes procurement of information technology (IT) related equipment such as the multi-media system, server, computers, networking, and software. Technical…
January 1, 2007 Project Duration: Jan 2007 – Aug 2007. Detailed Engineering Design and Preparation of Bidding Documents: Subject to approval to proceed with the Sub-Project being given by the ADB and the…
August 1, 2007 Project Duration: August 2007 – September 2008. –The project consists of Feasibility Study and Environmental Impact Assessment of MarsyangdiBesi Hydroelectric Project (50 MW) in LamjungDistrcit, Nepal -Planning, survey and Investigation…
August 1, 2007 Project Duration: August 2007 – June 2010. The Government of Bhutan is keen to promote good governance by reducing exiting corruption in the country in order to improve management of…
September 1, 2007 Project Duration: September 2007 – October 2007. The Major Training contents covered in Training are Overview of RWSSFDB/ it’s policies, plan, strategies, working modalities targets & achievement, role of different…
March 1, 2008 Project Duration: March 2008 – June 2009. –The project consists of Feasibility Study and Environmental Impact Assessment of MarsyangdiBesi Hydroelectric Project (50 MW). -Planning, survey and Investigation including visual survey,…
December 1, 2008 Project Duration: December 2008 – November 2011. The objective of SFAS is to provide financial assistance to meritorious and economically disadvantaged students with special focus on females and disadvantaged caste/ethnicity…
December 1, 2008 Project Duration: December 2008 – January 2010. The TA will support the Government’s initiatives in strengthening the institutional capacity of anticorruption institutions, thereby improving their ability to fulfill their statutory…
April 19, 2010 Project Duration: 19 April 2010 – 29 October 2010. Japan International Cooperation Agency (JICA) commences ex-post evaluation study on ODA funded projects which were completed two years ago. The ex-post…
August 1, 2010 Project Duration: August 2010 – September 2012. –Establish the natural resource conservation leaders memorial center of excellence in teaching and learning at the Institute of Forestry -Strengthen the professional skills,…
August 1, 2010 Project Duration: August 2010, September 2012. –Establish the natural resource conservation leaders memorial center of excellence in teaching and learning at the Institute of Forestry -Strengthen the professional skills, knowledge…
March 1, 2011 Project Duration: March 2011 – August 2012. This study is basically an outcome of consultative and investigative work that highlights on the Strategic And Action Plans adopted by the stakeholder…
March 1, 2011 Project Duration: March 2011 – August 2012. The Major Training contents covered in Training are Overview of RWSSFDB/ it’s policies, plan, strategies, working modalities targets & achievement, role of different…
March 1, 2011 Project Duration: March 2011 – August 2012. This study is basically an outcome of consultative and investigative work that highlights on the Strategic And Action Plans adopted by the stakeholder…
August 1, 2012 Project Duration: August 2012 – September 2012. The Major Training contents covered in Training are Overview of RWSSFDB/ it’s policies, plan, strategies, working modalities targets & achievement, role of different…
August 1, 2012 Project Duration: August 2012 – September 2012. The Major Training contents covered in Training are Overview of RWSSFDB/ it’s policies, plan, strategies, working modalities targets & achievement, role of different…
August 1, 2012 Project Duration: 1 August 2012 – 31 October 2013. Construction Supervision of Choir – Sainshand (35th Railway Crossing) Road Project LoT-2 (KM90 to KM 176.4) 86.4 KM and addtional 2.8KM…
October 2, 2012 Project Duration: 2 October, 2012 – 1 May, 2017. – Identification of potential subprojects following subproject selection criteria, detailed design including review of preliminary design done by the PPTA consultant…
November 1, 2012 Project Duration: November 2012 – December 2013. -Review the documents, reports and other relevant materials available in MEDEP and in elsewhere. -Design detail employment and poverty analysis methodology and research…
January 1, 2013 Project Duration: 1 January 2013 – 1 October 2017. Akhaura – (R102) – Darkhar – (N102) – Comilla – (N1) – Chittagong, a total of 215km (Priority No.2) -Upgrading of…
April 1, 2013 Project Duration: 1 April, 2013 – 1 May, 2014. Construction Supervision of Choir – Sainshand (35th Railway Crossing) Road Project LoT-2 (KM90 to KM 176.4) 86.4 KM and addtional 2.8KM…
April 1, 2013 Project Duration: April 2013 – December 2017. Samarth –NMDP is the first programme to apply the making market work for poor approach in Nepal. Devtec is an implementing partner for…
July 1, 2015 Project Duration: July 2015 – September 2015. Samarth Nepal Market Development Program (Samarth-NMDP) is a five-year UK aid-funded rural market development programme operating across Nepal. Samarth-NMDP has recently been approached…
January 1, 2016 Project Duration: January 2016 – Ongoing. The main purpose of the Study in Phase 1 is to Explore Alternative Methods and Modalities to Deliver DPEd to all existing untrained teachers…
January 1, 2016 Project Duration: January 2016 – July 2017 As part of the Teacher Education Development (TED) Plan, the Need-based Sub-cluster Training will be replicated nationwide in phases all over the country…
January 1, 2016 Project Duration: January 2016 – Ongoing. The purpose of the Activity is to construct up to 15 grain banks across the districts to safeguard grain held by households for food…
October 1, 2016 Project Duration: October 2016 – Ongoing. This project will contribute on increasing resource efficiency, profitability and sustainable growth in Nepal by mobilizing the private sector and relevant public sector authorities…
October 1, 2016 Project Duration: October 2016 – Ongoing. The Consultant’s assignment shall be aimed at supporting Nepal Rastra Bank and KfW in the selection of eligible PFIs for the program. The selection…
March 17, 2017 Project duration: 4 November 1998 – 6 November 1998. The Rural Water Supply and Sanitation Fund Development Board (RWSSFDB) is implementing a demand led community based Rural Water Supply and…
November 1, 2017 Project Duration: November 2017 – May 2018. A 7.8 magnitude earthquake struck central Nepal on 25 April 2015, causing more than 8,700 deaths and 25,000 injuries as well as damaging properties…
May 1, 2018 Project Duration: May 2018 – November 2018. The purpose of the part of the project under this contract is to support agriculture sector ministries to evaluate effectiveness of implemented CCA…
July 1, 2018 Project duration: July 2018 – December 2018 The Skills Development Project (SDP) is implemented under the ADB Grant (USD 20 M) and Government of Nepal (GON) fund (USD 5 M) which…
September 1, 2018 Project duration: September 2018 – Ongoing Beneficiary Engagement Study (BES) under SNRTP is focused to assess existing beneficiary monitoring system so as to ensure the quality of the physical works…
December 1, 2018 Project duration: December 2018 – Ongoing The broader objective of organizing these interactive workshops as a component of KMKN, were to share the status, experiences, best practices, lesson learned and way…
December 1, 2018 Project duration: December 2018 – Ongoing The general objective of the TVET public private partnership (known as the TVET‐PP project) action to which SAKCHYAMTA is part is to contribute to…
November 1, 2019 Project duration : November 2019 – Ongoing The main objective of the consulting services is to carry out the household and community surveys on sample basis within the command area of…
January 2, 2020 Project duration: Feb 2020 – March 2020 In implementing the proposed activities, we will take the participatory and process consulting approach which involves facilitating the process of change in the organization…
January 5, 2020 Project duration: May 2020 – June 2020 Based on the construction typology as available in the EHRP MIS, the consulting firm will stratify the sample that should total to 900…
December 1, 2020 Project duration: December 2020 – Ongoing The Government of Philippines has received the loan from ADB. The fesibility study of Laguna Lakeshore Road Network (LLRN) has been completed in 2020….
March 1, 2021 Project duration: March 2021 – June 2024 Task 1 Contract Supervision: Construction of (1) about 30 Km of Climate resilient two-lane highway (including tunnels and bridges) between Oblgram and Tagikamar,…
October 1, 2021 Project duration: October 2021 – Ongoing The Road Maintenance Project (RMP) is financed by the Millennium Challenge Corporation (MCC) under the Compact signed in 2017with the Government of Nepal (GON)….
February 1, 2023 Project duration: February 2023 – June 2023 To study the condition of farmers’ access to natural resources used in agriculture To identify suitable measures for increasing farmers’ access to natural…
February 1, 2023 Project duration: February 2023 – June 2023 To study the business conditions of multinational companies operating in the agricultural sector, To prepare a report to identify the problems seen in…
May 1, 2023 Project duration: May 2023 – Ongoing The main objective of EIA is to identify possible physical, biological, socio-economic and socio-cultural impacts due to the proposal and to propose mitigation measures….
June 1, 2023 Project duration: June 2023 – Ongoing The major objective of this study is to identify the employability status of graduates. It also analyses or update the demand of labour market,…
Mahendra Raj Marg – Tulsipur Highway
Narayani River Bridge
Tribhuvan International Airport & Terminal
Management Assistance to National Construction Company (NCCN)
Birgunj-Hetauda Bridge Project
MRM-Kohalpur-Mahakali Highway
Nepal’s Multimodal Containerization Feasibility Study Phase I.
City Maps of Kathmandu and Patan
Resource Inventory of 230 Panchayats of Rapti Zone. (Desk Study).
Kohalpur-Mahakali Highway Project Construction Management Group.
Resource Conservation and Utilization Project. Project # 367-0132 Myagdi, Mustang & Gorkha
Electrical Power Supply Systems of Rampur Agriculture Campus.
Socio-Economic Evaluation Study of Department of Cottage and Village Industry Trained Women Labors.
Resource Inventory of 230 Panchayats Rapti Zone Phase II (Field Verification.)
Nepal’s Multimodal Containerization Phase II.
Tribhuvan International Airport Landscaping Project – Kathmandu
Impact Evaluation and Analysis Study of the Forestry Development Project
Detailed Survey and Design of Chitwan Forestry Road
Remote Area Access Feasibility Study Phase I
Detailed Survey and Design of Arghakhanchi and Gulmi Roads Project
Detailed Feasibility Survey and Design of Kakari-Melghat Irrigation Project
Evaluation Study of Major Bus Parks of Nepal.
Food Aid as a Development Resource in Nepal: A Reassessment USAID/Nepal
Post-Construction Evaluation Survey of Establishment of Load Dispatching Centre and Reinforcement of Distribution Network in Kathmandu Valley (Energy/Power Sector)
Remote Area Access Study Project Phase II
Remedial Construction Work of Community Medical Auxiliary Campus, Six Health Posts and River Training Works in Dhankuta District Phase I & II (Evaluation and Estimates)
Alleviation of Food Deficit in Jumla District K-BIRD/CIDA
Detail Feasibility Study of Gankhu Irrigation Project, Gorkha District
Detailed Feasibility Study of Kisan-Aandhighat Irrigation Project, Syanja District
Evaluation Study of Existing Bus Routes and Parking Facilities in the Kingdom of Nepal
Detailed Survey and Design of Himali Chiya Bagan Roads Project
Detailed Survey and Design of Chaurjahari-Jajarkot Road Project
Management Plan for Siwalik Hills of Dhanusha District, Janakpur
Study on Household Energy Conservation in Dhanusha District
Nepal Multimodal Containerization Project – Phase II
Spot Height Survey of Existing Tubewells in Sunsari and Morang District
Feasibility survey & Design of Majuwa Lohari Dovan Irrigation Project Dolkha District.
Feasibility survey & Design of KhaniKhola Irrigation Project Dolkha District.
Feasibility survey & Design of AndheriiKhola Irrigation Project Dolkha District.
Feasibility survey & Design of. Jangha Khola Irrigation Project Mahottari District
Feasibility survey & Design of Rupani Nadi Irrigation Project. Mahottari District
Feasibility survey & Design of Kantawa Nadi Irrigation Project. Mahottari District
Feasibility survey & Design of Bhimtar (Bhotsipa) Irrigation Project Sindupalchowk District.
Feasibility survey & Design of Bhote Solang Irrigation Project Sindupalchowk District.
Feasibility survey & Design of Mulkulo Irrigation Project Sindupalchowk District.
Remedial Construction work of Community Medical Auxiliary Campus, six Health Posts and River Training Works in Dhankuta District Phase III (Design & Construction Supervision)
Assessment study of Narayan Devi Irrigation Project, Dolkha District.
Baseline Survey of Karnali-Bheri Integrated Rural Development Project (K-BIRD)
Baseline Survey of K-BIRD Project Area in Surkhet, Dailekh and Jumla Districts
Spot Height Survey of Existing Tubewells in Jhapa
Fertilizer Sector Management Evaluation Study of Agriculture Input Corporation Kathmandu
Spot Height Survey of Existing Tubewells in Banke
Dhankuta District Resource Analysis Study
Review and Evaluation Study of Successful of TA Projects in Nepal
Rapid Appraisal Survey of Dhap Khola (Darchula) and Siero Khola (Dadeldhura) Irrigation Project
Nepal Forestry Development
Spot Height Survey of Existing Tubewells in Dhanusha and Sarlahi
Spot Height Survey of Existing Tubewells in Saptari and Siraha
Udai Thakali Groundwater Irrigation Project
Shallow Aquifer Investigation Study of Chitwan District
Shallow Aquifer Investigation Study of Mahottari District
Forestry Sector Technical Assistance Evaluation Study
Shallow Aquifer Investigation Study of Kailali District
Shallow Aquifer Investigation Study of Bardiya District
Shallow Aquifer Investigation Study of Kanchanpur District
Micro Projects Facilitation and Supervision of Gulmi and Arghakhanchi Districts
Nepal Multimodal Containerization Project: Review and Update of 1990 Feasibility Report
Financial and Management Feasibility Study of Milk Producers Associations (MPA) Participation in Dairy Business
Road Maintenance Program: Phase I A and B
Formative Evaluation of Community Development Component Of K-BIRD Drinking Water and Irrigation Projects
Formation Evaluation Study of Women Literacy, Family Life and Income Generation Program
Impact Evaluation Study of Karnali – Bheri Intergrated Rural Development (K-BIRD) Project
Floodway/Bridge Design, Kohalpur-Mahakali Highway Project
Road Maintenance: Policy Action Program Workshop
Impact Study of Ceramic Promotion Project
Engineering Education Project IDA Credit No. 2044-NEP
Rural Drinking Water and Sanitation Feasibility Study (Development Phase) – I Traunche
Rural Drinking Water Supply and Sanitation Programme
Rural Drinking Water Supply and Sanitation Programme
Rural Drinking Water Supply and Sanitation Programme
Community Action Plan for Drinking Water Supply and Sanitation Programme in Dhading District
Community Action Plan for Drinking Water and Sanitation Program in Dhading District (Traunche – 1), Development Phase
Rural Drinking Water Supply and Sanitation Programme
Community Action Plan for Rural Water Supply and Sanitation Program, Development Phase Contract
Valuation of 39 Chilling Centers and 2 Cheese Plants of Dairy Development Corporation of Nepal
Community Action Plan for Drinking Water and Sanitation Program in Dhading District Implementation Phase
Knowledge, Attitude and Practice (KAP) Evaluation Survey of 30 RWSS Schemes,Baseline Survey – I Traunche (30 Schemes)
Community Action plan for Drinking Water and Sanitation Program in Dhading District Development phase (Traunche – 2)
NEPAL- POPULATION AND FAMILY HEALTH PROJECT IDA Credit No. 2600 NEP
Proforma Cut Flower Production/ Packing/ Marketing Business Plan in Kathmandu Valley
Rural Water Supply and Sanitation Programme, Full Service Deviltry Contract
Anbukhaireni-Gorkha Resealing Training Contract
Service Organisation (SO) Orientation Workshop on Pre-feasibility Study
Ferro – Cement Tank Construction and Basic plumbing Training
Data collection of four bridges for feasibility study
Consumer Billing System
Socio-Engineering Study on the Proposed Pharping-Kulekhani Road Project
Community Forestry Users’ Group Training – Forest Development Project/ Nepal.
Knowledge, Attitude and Practice (KAP) Evaluation Survey of 9 RWSS Schemes(Baseline Survey — I)
Impact Evaluation Study of Knowledge, Attitude and Practice (KAP)
Road Maintenance and Rehabilitation Project
Digitization of about 100 planning maps on Nepal Road Statistics and the training program on the use of data-based CAD and digitization work.
Review of Successful Technical Assistance Operations of Water Supply & Irrigation Projects – Nepal
Inspection and Rectification of Communication Masts Pools and Water Supply Tank at Man Bhawan, Lalitpur& British Camp, Pokhara
Project Management and Supervision Course Training for Engineers
Participation of Private Sector in Road and Bridges
General Management Training Course for Engineers/Coordinators
Detailed Investigation, Survey and Design of 8 bridges of Chameliya Hydroelectric Project Access Road.
Service Organization Pre-feasibility Site Appraisal of 24 RWSSFDB Schemes
RWSSFDB SO Orientation on Pre-feasibility Study
Environmental Impact Assessment (EIA) Training
Pre Service Entrance Training for BELTRONIX Staff
Orientation Training on Pre-feasibility Site Appraisal and Assessment for RWSSFDB SA Staffs.
Pre-feasibility Site Appraisal & Assessment
Detailed Mapping of Banepa Municipality on the basis of topographical and household survey
Rural Finance Project (ADB TA No. 2836-NEP
Non-Technical Loss Reduction Project
Rural Water Supply and Sanitation Program in Dhading District (Batch II Development Phase)
Rural Water Supply and Sanitation Feasibility Study Study (Development Phase) – Batch II
Compliance & Process Monitoring and Evaluation of 38 RWSSFDB Schemes
Design and Resealing Training Contract (Bhardhagat – Dhumkibas, Sunwal – Parasi)
Community Water Supply Design and Construction Supervision Training for RWSSFDB SO Overseers
Institutional Strengthening of Civil Aviation Authority of Nepal (CAAN)
Pre-feasibility Site Appraisal and Assessment of Batch III SOs
Data based GIS Mapping of Electricity Distribution System under Kathmandu West Branch, Kalimati
Community Action Planning for Rural Drinking Water and Sanitation Program, Implementation Phase – Batch II Programs
Rural Water Supply and Sanitation Program – Community Action Planning, Implementation, Batch II Programs
Refresher Training on CAP&HSE to Community Workers of Batch III Implantation Phase (two groups)
Basic Health & Sanitation Education and CAP Process for Community Technicians
Basic Health & Sanitation Education and CAP Process for Community Workers
Rural Water Supply and Sanitation Program – Community Action Planning, Development Phase – Batch III
Watershed Rehabilitation and Management Project TA-No. 3121-NEP
CAP Orientation Training to SO Team Leaders, Software Supervisors and Field Coordinators
Technical Supervisors Training on Community Design and Supervision Works (2 Packages)
Basic Health & Sanitation Education and CAP Process for Community Technicians
Preparation of GIS Electronics Data file of Nepal Electricity Utility Statistics (NEUS-2000)
Preparation of GIS data through ARC/INFO
One Day Orientation Training on Pre-feasibility Study for Batch I& II SOs
Orientation Training on Pre-feasibility Study for Batch III& IV SOs (2packages
Sunkoshi Small Hydropower Project, 2.6 MW in Sindhupalchowk District.
Feasibility Study on Establishing a Domestic Environmental Labelling Scheme for Export Industries in Nepal
Orientation Training on Pre-feasibility Site Appraisal for Batch IV SAs (2 Packages)
Consumer Billing System
Basic Foreman and Plumbing Training to Community Technicians of Batch III Implementation Phase
Basic Community Water Supply And Sanitation Technician Training
Consumer Management System
Ferro Cement Tank Construction Training to Community Technicians of Batch III Implementation Phase
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch III Amleshwor Water Supply Scheme
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch III Panchakanya Water Supply Scheme
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch III Bitalab Water Supply Scheme
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch III Baniyatar Dharke Water Supply Scheme
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch III Chainpur Water Supply Scheme
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch III Saptagram Water Supply Scheme
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch III Kaule Water Supply Scheme
Refresher Training on CAP&HSE to Community Workers of Batch III Implantation Phase (two groups)
Basic Health & Sanitation Education Training for Community Workers
Basic Health & Sanitation Education Training for Community Workers
Refresher Training on Basic Health & Sanitation Education (HSE) and Community Action Plan (CAP) for Community Workers
Basic Health & Sanitation Education Training for Community Workers
Basic Health & Sanitation Education Training for Community Workers
South Asia Regional Incentive for Energy Development
Rural Water Supply and Sanitation Feasibility Study (Development Phase) – Batch IV
Rural Water Supply & Sanitation Program – Community Action Planning, Development Phase, Batch IV
Basic Health & Sanitation Education and CAP Process for Community Workers/Technicians
Basic Health & Sanitation Education and CAP Process for Community Workers/Technicians
Basic Health & Sanitation Education and CAP Process for Community Workers/Technicians
Basic Health & Sanitation Education and CAP Process for Team Leader, Field Coordinator & Software Supervisor
Community Design and Supervision Training to Technical Supervisors of Batch IV
Community Design and Supervision Training to Technical Supervisors of Batch IV
Current Status Survey of Three Wheeler Electric Vehicles of SAFA Tempo Kathmandu valley and Appraisal Study of Operating the EV of Some Metropolitan Cities of Nepal
Review of Education Programme
Benefit Monitoring Evaluation (BME) and Project Completion Report (PCR) Preparation
Hotel Management System
Financial Sector Reform Project – Re-engineering of Nepal Rastra Bank
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch IV Ghairaundevi Water Supply Scheme, Kaleri, Dhading
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch IV Barahi Water Supply Scheme, Satkilo, Dhading
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch IV Jaldevi Water Supply Scheme, Kharkedanda, Dhading
Rural Water Supply and Sanitation Programme – Community Action Planning Implementation Phase, Batch IV Himalayadevi Water Supply Scheme, Bhumisthan, Dhading
Basic Foreman and Plumbing Training to Community Technicians of Batch IV Implementation Phase
Ferro Cement Tank Construction Training for Community Technician of Batch IV Implementation Phase
Orientation programme on “Social Development Issues of Nepal”
Detail Land Survey and Land Development
Rehabilitation of Phalite Water Supply and Sanitation Scheme
Skills for Employment Project ADB-TA-NEP 4012
Secured Business Solution
Sharing and Learning Workshops on EASA in different levels in Nepal.
Secured Business Solutions
Detail Survey, design and supervision of land, infrastructure and Business plan
Secured Business Solution (GAS)
Environment Assessment of Gomphu-Panbang Highway
Job Evaluation, Salary and Human Resources Challenge Survey
Program Assessment of Natural Resource Conservation Heroes Memorial Centre of Excellence Rural Development and Food Security
Irrigation and Water Resources Management Project-Environmental Advisor to the project
Rural Water Supply and Sanitation Programme – Training Program on CAP/HHS including Conflict Management Training to CW/CT for Three Groups of Training
Environmental Assessment Study for Gongphu- Panbang Highway Road Project, Bhutan
Training Program on CAP/HHS including Conflict Management for Community Workers (CWs) and Community Technicians (CTs) of Batch – VI (Group – 1)
Training Program on CAP/HHS including Conflict Management for Community Workers (CWs) and Community Technicians (CTs) of Batch – VI (Group – 2)
ADB TA No 4765-NEP: Operationalization for Managing of Development Result
ADB TA No. Grant 0065-NEP Education Sector Capacity Development Project (Package B)
ADB TA No. Grant 0002-INO: Earthquake and Tsunami Emergency Support project (Package 28 – Project Preparation Consultants (PPC) – Phase II for Roads and Bridges Sector)
Feasibility Study and Environmental Impact Study of MarsyangdiBesi Hydroelectric Project (50 MW)
RETA No. 6337 – Bhutan Anticorruption and Good Governance at Local
Rural Water Supply and Sanitation Programme – CAP/HHS including Conflict Management Training to CW/CT for Three Groups of Training
Feasibility Study and Environmental study of Trisuli Galchi Hydroelectric Project (75 MW), Dhading District
WB/ SFAFDB: Administration of Student Financial Assistance Trust Fund for Student Financial Assistance Fund Development Board (SFAFDB)
ADB TA 4962-NEP: Support to Anticorruption Institutions
The ex-post evaluation study Kali Gandaki “A” Hydroelectric Project
Program Assessment of Natural Resource Conservation Heroes Memorial Centre of Excellence
Program Assessment of Natural Resources Conservation Heroes Memorial Centre of Excellence (USAID)
Preparation of Strategic Plan and Action Plan for Solid Waste Management for 15 Municipalities
Preparation of Strategic Plan and Action Plan for Solid Waste Management for 15 Municipalities
Preparation of Strategic Plan and Action Plan for Solid Waste Management for 15 Municipalities
Rural Water Supply and Sanitation Programme – CAP/HHS including Conflict Management Training to CW/CT for one Group of Training
Rural Water Supply and Sanitation Programme – CAP/HHS including Conflict Management Training to CW/CT for two Groups of Training
Project management and construction supervision consultant for MCA-M Road Project (HPM); Construction of Choir – Sainshand (35th Railway Crossing) Road Project LoT-2 (KM90 to KM 176.4), Mongolia, Contract No: CA/MCA-M/MCC/RP/WKS/170/2011;
Management Design and Supervision (MDS) Consultancy Services for City Regions Development Project (ADB Loan #2695 BAN (SF)
MEDEP- Evaluation of MEDEP Implementation Partners Performance Evaluation of BDSPOs/DMEGAs in selected districts of MEDEP III
Sub-Regional Transport Project Preparatory Facility (ADB Loan #2688-BAN) Consultancy Services for Feasibility Study and Detailed Design of Roads and Bridges – Road Component Package 2
Supervision of construction work of 132.6 km asphalt road between Undurkhaan-Munkhaan-BaruunUrt, Mongolia
Samarth – Nepal Market Development Programme I & II
Samarth-NMDP: Construction of Community Food and Seed Grain Storage Banks – SCOPING STUDY
ADB funded A Study on Exploring Alternative Method and Modalities of Providing DPEd to all Primary Teachers under PEDP-3 and A Feasibility Study on Introducing DPEd as Pre-Serving Training (Phase-2) (Contract No. PS 515
ADB funded Monitoring and Mentoring of Need-based Sub Cluster Training under Third Primary Education Development Program (PEDP-3)
Samarth – Nepal Market Development Programme Construction of Community Food and Seed Grain Storage Banks In Lamjung, Tanahun and Makwanpur
Technical Review and Production of Cleaner Production Manual (Carpet Washing, Wool and Yarn Dyeing and Pashmina)- European Commission (EU) funded SWITCH Asia Project named Enhancing Sustainability
Sustainable Economic Development in Rural Areas/Nepal Funded by KfW
Orientation Training on Pre-feasibility Site Appraisal for SA Staffs
Consulting services for WB Selection#1244727/ Third Party Monitoring Agent under Nepal Earthquake Housing Reconstruction Project
Consulting services for Implementation of “Agriculture Sector Impact Monitoring and Evaluation framework development improving evidence for CCA (NAP) results”
Tracer Study ‐ Skills Development Project
Project for Strengthening the National Rural Transport Program (SNRTP) Beneficiary Engagement Study‐ Contract No.: SNRP‐ CPCU‐CS‐CQS‐37‐075‐76
Knowledge Management and Knowledge Networking
Joint Study to Identify the Most Demanded occupation in the Tourism Sector‐ SAKCHYAMTA funded by European Union
Rani Jamara Kulariya Irrigation Project‐ Midline Survey for Impact Evaluation Study of RJKIP
Professional Advisory Services
ERPH‐ Telephonic Interviews
Detailed Engineering Design and Pre-Construction Phase Consulting Services of Laguna Lakeshore Road Network (LLRN) Project Phase-1
Central Asia Regional Economic Cooperation Corridors 2, 3, and 5 (Obigarm-Nurobod) Road Project Grant No. 0683-TAJ
Procurement of Consultancy Services for a 40km Pilot road section, with one alternative option for an additional 37km road section – Engineering Designs, Initial Environmental Examination (IEE), TIP Risk Management Plan Development, Resettlement Action Plan (RAP) Development, RAP Implementation Supervision and Construction Supervision, Nepal (Ref No: MCAN/ RMP/QCBS/001)
To conduct a study for increasing the access of farmers to the natural resources used in agricultural work and for preparing a solid action plan to establish their rights
Monitoring the work and business studies of multinational companies operating in the agricultural sector and providing suggestions to the Government of Nepal to make necessary regulations
Preparation of Environmental Impact Assessment (EIA) of Sustainable Collection and Extraction of Sand, Gravel, Boulders from Mahakali River
Tracer Study of Skill Test Graduates certified by NSTB