Project duration: January 1988 – July 1988.

This was a detail feasibility survey and design study of 22 km of forest road near the Nepal India boarder in Central Development Region. This part of the forest is considered as one of the thickest forest in the Nepal and rich with flora and fauna. This study was carried out with the help of arun guards of RNA.