Project duration: March 1995 – June 1995.

Data from the four different bridge sites were collected for a detailed feasibility study of the bridge projects located at different districts of Nepal. Both the technical and socio-economic data were collected in the course of this study to generate the findings with recommendations.

Both the technical as well as the socio-economic data were analyzed to determine the techno-economic viability of these bridges located at various districts of Nepal.