Mahendra Raj Marg – Tulsipur Highway

January 1, 1973

Project duration: January 1973 – January 1985. (Devtec Nepal joined this project since January 1983)  The initials phase involved a feasibility study of several alternatives roads networks giving access to…

Read more

Narayani River Bridge

January 1, 1973

Project duration: January 1973 – January 1985. (Devtec Nepal joined this project since January 1983) The longest of four major bridges on an 80 km long highway construction project under construction…

Read more

Tribhuvan International Airport & Terminal

December 1, 1976

Project duration: December 1976 – 1986. (Devtec Nepal joined this project since January 1983) Airfield Pavements: Completed consulting services were provided for the rehabilitation of existing runway, taxiway and aircraft apron…

Read more

Management Assistance to National Construction Company (NCCN)

October 1, 1980

Project duration: October 1980 – June 1983. (Devtec Nepal joined this project since January 1983) In 1976 the National Construction Company of Nepal (NCCN) was awarded a contract with a value…

Read more

Birgunj-Hetauda Bridge Project

January 6, 1983

Project duration: 1983 – 1989. A Preliminary engineering report was prepared complete with cost estimates covering the economic feasibility of replacing obsolete single-lane bridges on Raxaul-Kathmandu Highway. Nineteen possible bridges…

Read more

MRM-Kohalpur-Mahakali Highway

September 1, 1985

Project duration: September 1985 – October 1994.  The Kohalpur-Mahakali Highway Project is located in the Mid Western and Far Western Development Regions of Nepal.  The highway runs approximately east to…

Read more

Nepal’s Multimodal Containerization Feasibility Study Phase I.

October 1, 1985

Project duration: October 1985 – March 1986. Traffic forecasts for Third Country and India Bilateral trade, economics, cost and financial analyses; warehousing, ports and trucking facilities design; international documentation; and…

Read more

City Maps of Kathmandu and Patan

January 1, 1986

Project duration: January 1986 – March 1986. At the request of Asian Development Bank, Manila, DEVTEC prepared the city maps of Kathmandu at scale of 1:10000 scale and Patan at…

Read more

Resource Inventory of 230 Panchayats of Rapti Zone. (Desk Study).

February 1, 1986

Project duration: February 1986 – June 1986. The Rapti Area Development Project (367-0219) was implemented in 1980 following the agreement between the USAID/Nepal and His Majesty’s Government of Nepal (HMG/Nepal)….

Read more

Kohalpur-Mahakali Highway Project Construction Management Group.

May 1, 1986

Project duration: May 1986 – October 1990. The area covered by these maps lies within the Kathmandu Ring Road. In these maps, the important places and offices of government and…

Read more

Resource Conservation and Utilization Project. Project # 367-0132 Myagdi, Mustang & Gorkha

July 18, 1986

Project duration: July 18, 1986 – July 17 1987. As per the contract DEVTEC alone provided three Financial Managers for three different stations (project areas) who maintained the project accounts,…

Read more

Electrical Power Supply Systems of Rampur Agriculture Campus.

September 1, 1986

Project duration: September 1986 – September 1986. The study was done for Winrock International to investigate and recommend the existing power supply system in Rampur agriculture Campus and Parwanipur Agriculture…

Read more

Socio-Economic Evaluation Study of Department of Cottage and Village Industry Trained Women Labors.

November 6, 1986

Project duration: November 1986 – April 1987. The object of the study is to find out the economic and employment status of the women labours who are trained by DVCI….

Read more

Resource Inventory of 230 Panchayats Rapti Zone Phase II (Field Verification.)

February 27, 1987

Project duration: February 27 1987 – December 7 1989. This is a comprehensive resource inventories of the 229 village  and one town panchayat of five districts of Rapti Zone. The…

Read more

Nepal’s Multimodal Containerization Phase II.

March 1, 1987

Project duration: March 1987 – April 1987. Traffic forecasts for Third Country and India Bilateral trade, economics, cost and financial analyses; warehousing, ports and trucking facilities design; international documentation; and…

Read more

Tribhuvan International Airport Landscaping Project – Kathmandu

June 1, 1987

Project duration: June 1987 – December 1989. Landscaping Expert (Architect) and Flowerish: Designing, Planning, Management and Execution. Detailed designing of the specified areas of the Tribhuwan International Airport where the…

Read more

Impact Evaluation and Analysis Study of the Forestry Development Project

October 1, 1987

Project duration: October 1987 – December 1987. This study was assign to the Tropical Research & Development Inc. and Devtec was associated as a local consulting Firm. The study objective…

Read more

Detailed Survey and Design of Chitwan Forestry Road

January 1, 1988

Project duration: January 1988 – July 1988. This was a detail feasibility survey and design study of 22 km of forest road near the Nepal India boarder in Central Development…

Read more

Remote Area Access Feasibility Study Phase I

January 1, 1988

Projet duration: January 1988 – September 1988. This was a technical assistance project financed by the World Bank. The study was assigned to a BCEOM, France and Devtec Nepal Pvt….

Read more

Detailed Survey and Design of Arghakhanchi and Gulmi Roads Project

February 1, 1988

Project duration: February 1988 – July 1988. Department for International Development (DFID), U.K. had provided grant assistance to HMG/Nepal for road maintenance skill development program through Department of Roads. The…

Read more

Detailed Feasibility Survey and Design of Kakari-Melghat Irrigation Project

March 1, 1988

Project duration: March 1988 – August 1988. The proposed project irrigates net 65 ha of land in Baitadi District of Mahakali Zone. Detailed feasibility, including survey and design works were…

Read more

Evaluation Study of Major Bus Parks of Nepal.

March 1, 1988

Project duration: March 1988 – July 1988. The Department of Transport awarded the work of evaluation of the existing major Bus Parks of TEN important cities of Nepal i.e. Butwal…

Read more

Food Aid as a Development Resource in Nepal: A Reassessment USAID/Nepal

June 1, 1988

Project duration: June 1988 – August 1988. The USAID/Nepal had assigned two International Consultants of Colorado State University USA, to prepare a reassessment report on food aid as a development…

Read more

Post-Construction Evaluation Survey of Establishment of Load Dispatching Centre and Reinforcement of Distribution Network in Kathmandu Valley (Energy/Power Sector)

September 1, 1988

Project duration: September 1988 – January 1989. JICA/Nepal

Read more

Remote Area Access Study Project Phase II

October 1, 1988

Project duration: October 1988 – 1990 The services provided were: Topographic survey, traffic studies, hydrological study, geo-technical investigations, and socio-economic analysis including engineering survey and cost estimate. The assignment was…

Read more

Remedial Construction Work of Community Medical Auxiliary Campus, Six Health Posts and River Training Works in Dhankuta District Phase I & II (Evaluation and Estimates)

November 1, 1988

Project duration: November 1988 – March 1989. Assist Canadian Corporation Office (CCO) Kathmandu in survey, design, cost estimate, preparation of tender documents, bid evaluation, construction, monitoring and supervision works of…

Read more

Alleviation of Food Deficit in Jumla District K-BIRD/CIDA

December 1, 1988

Project duration: December 1988 – June 1989. The overall objective of this study is to analyses the food production and self-sufficiency situation in Jumla District and to examine the possibilities…

Read more

Detail Feasibility Study of Gankhu Irrigation Project, Gorkha District

January 1, 1989

Project duration: January 1989 – August 1989. The above project was awarded to Devtec by Department of Irrigation Feasibility Study Project Office. The project TOR comprises detailed survey, design and…

Read more

Detailed Feasibility Study of Kisan-Aandhighat Irrigation Project, Syanja District

January 1, 1989

Project duration: January 1989 – August 1989. Based on the requests received by DOI, detailed feasibility survey, design and cost of the scheme were prepared. The eagerness of the beneficiaries…

Read more

Evaluation Study of Existing Bus Routes and Parking Facilities in the Kingdom of Nepal

February 1, 1989

Project duration: February 1989 – July 1989. The Department of Transport awarded the work of evaluation of the existing major Bus Parks of TEN important cities of Nepal i:e. Butwal…

Read more

Detailed Survey and Design of Himali Chiya Bagan Roads Project

February 1, 1989

Project duration: February 1989 – August 1989. This is a detailed survey and design work of about 6.0 km of the Terai Road in the existing Tea Garden of the…

Read more

Detailed Survey and Design of Chaurjahari-Jajarkot Road Project

February 1, 1989

Project duration: February 1989 – August 1989. Devtec conducted the detail survey design and cost estimate of this road project. This is an excess road linking the district headquarter of…

Read more

Management Plan for Siwalik Hills of Dhanusha District, Janakpur

March 1, 1989

Project duration: March 1989 – August 1989. District Forest Office, Dhanusa

Read more

Study on Household Energy Conservation in Dhanusha District

March 1, 1989

Project duration: March 1989 – August 1989. District Forest Office, Dhanusa

Read more

Nepal Multimodal Containerization Project – Phase II

March 12, 1989

Project duration: March 1989 – December 1989. Survey of different custom posts and their existing warehouse location, facilities, approach, import and export data, office buildings and area etc. for future…

Read more

Spot Height Survey of Existing Tubewells in Sunsari and Morang District

July 1, 1989

Project duration: July 1989 – December 1989. HMGN, Ministry of Water Resources, Ground Water Resource Development Project also supported by UNDP/World Bank had established its branch offices in different districts…

Read more

Feasibility survey & Design of Majuwa Lohari Dovan Irrigation Project Dolkha District.

September 1, 1989

Project duration: September 1989 – November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…

Read more

Feasibility survey & Design of KhaniKhola Irrigation Project Dolkha District.

September 1, 1989

Project duration: September 1989 – November 1990. Proposed Irrigation Project was surveyed by the team with an objective to provide the social, technical and economic aspects of an Irrigation System…

Read more

Feasibility survey & Design of AndheriiKhola Irrigation Project Dolkha District.

September 1, 1989

Project duration: September 1989 – November 1990. Proposed Irrigation Project was surveyed by the team with an objective to provide the social, technical and economic aspects of an Irrigation System…

Read more

Feasibility survey & Design of. Jangha Khola Irrigation Project Mahottari District

September 1, 1989

Project duration: September 1989 –  November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…

Read more

Feasibility survey & Design of Rupani Nadi Irrigation Project. Mahottari District

September 1, 1989

Project duration: September 1989 – November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…

Read more

Feasibility survey & Design of Kantawa Nadi Irrigation Project. Mahottari District

September 1, 1989

Project duration: September 1989 – November 1990. The object of the study was to rehabilitate the existing system for better use of the available water resource for agricultural production.

Read more

Feasibility survey & Design of Bhimtar (Bhotsipa) Irrigation Project Sindupalchowk District.

September 1, 1989

Project duration: September 1989 – November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…

Read more

Feasibility survey & Design of Bhote Solang Irrigation Project Sindupalchowk District.

September 1, 1989

Project duration: September 1989 – November 1990. Proposed Irrigation Project was surveyed by the team with an objective to provide the social, technical and economic aspects of an Irrigation System….

Read more

Feasibility survey & Design of Mulkulo Irrigation Project Sindupalchowk District.

September 1, 1989

Project duration: September 1989 – November 1990. The objective of the study was to investigate the Social, Technical and Economical aspects of the Irrigation System in order to develop a…

Read more

Remedial Construction work of Community Medical Auxiliary Campus, six Health Posts and River Training Works in Dhankuta District Phase III (Design & Construction Supervision)

September 1, 1989

Project duration: September 1989 – March 1991. The Canadian International Development Agency (CIDA) had provided technical assistance to Nepal for establishment of Community Medical Auxiliary Training Campus and six health…

Read more

Assessment study of Narayan Devi Irrigation Project, Dolkha District.

November 1, 1989

Project duration: November 1989 – January 1990. This is an assessment study of the irrigation system having command areas of 350 ha (net) with a total population 469 Both technical…

Read more

Baseline Survey of Karnali-Bheri Integrated Rural Development Project (K-BIRD)

January 1, 1990

Project duration: January 1990 – June 1991. The overall goal of the Karnali-Bheri Integrated Rural Development Project (K-BIRD) was to increase and enhance self-initiated and sustainable economic, environmental and social…

Read more

Baseline Survey of K-BIRD Project Area in Surkhet, Dailekh and Jumla Districts

February 1, 1990

Project duration: February 1990 – August 1991. The overall goal of the Karnali-Bheri Integrated Rural Development Project (K-BIRD) was to increase and enhance self-initiated and sustainable economic, environmental and social…

Read more

Spot Height Survey of Existing Tubewells in Jhapa

February 1, 1990

Project duration: February 1990 – March 1990. HMGN, Ministry of Water Resources, Ground Water Resource Development Project also supported by UNDP/World Bank had established its branch offices in different districts…

Read more

Fertilizer Sector Management Evaluation Study of Agriculture Input Corporation Kathmandu

April 1, 1990

Project duration: April 1990 – January 1991. The Asian Development Bank TA project aims to review fertilizer policies at all stage of Supply and demand and ro recommend planning system…

Read more

Spot Height Survey of Existing Tubewells in Banke

June 1, 1990

Project duration: June 1990 – July 1990. HMGN, Ministry of Water Resources, Ground Water Resource Development Project also supported by UNDP/World Bank had established its branch offices in different districts…

Read more

Dhankuta District Resource Analysis Study

October 1, 1990

Project duration: October 1990 – May 1991. The Study has attempted to provide assistance to the DDC Planning Office, Dhankuta District in order to prepare a sound integrated multi-sectoral planning…

Read more

Review and Evaluation Study of Successful of TA Projects in Nepal

January 1, 1991

Project duration: January 1991 – December 1992. The Asian Development Bank has been involved for more than 10 years in the Rural Water Supply and Sanitation Sector in Nepal, providing…

Read more

Rapid Appraisal Survey of Dhap Khola (Darchula) and Siero Khola (Dadeldhura) Irrigation Project

February 1, 1991

Project duration: February 1991 – March 1991. This was an appraisal survey of the two HMG funded schemes managed by the local people. The main objectives of the appraisal survey…

Read more

Nepal Forestry Development

February 1, 1991

Project duration: February 1991 – June 1995. The USAID/Nepal had  provided a grant assistance of US $ 4.0 million to implement the Forestry Development programme in various districts of Nepal…

Read more

Spot Height Survey of Existing Tubewells in Dhanusha and Sarlahi

March 1, 1991

Project duration: March 1991 – April 1991. Ground Water Resource Development Program was established by HMG/N to provide and facilitate the rural population with sustainable ground water resources to be…

Read more

Spot Height Survey of Existing Tubewells in Saptari and Siraha

May 1, 1991

Project duration: May 1991 – June 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…

Read more

Udai Thakali Groundwater Irrigation Project

June 1, 1991

Project duration: June 1991 – October 1991. The main aim and objective of the study was to provide sustainable groundwater irrigation facilities to the local farmers of the area by…

Read more

Shallow Aquifer Investigation Study of Chitwan District

October 1, 1991

Project duration: October 1991 – November 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…

Read more

Shallow Aquifer Investigation Study of Mahottari District

October 1, 1991

Project duration: October 1991 – November 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…

Read more

Forestry Sector Technical Assistance Evaluation Study

November 1, 1991

Project duration: November 1991 – July 1992. This is an assessment and evaluation study of Nepal Forestry Sector Development activities assisted by International Banks, Bilateral Agencies and donnas countries.  The…

Read more

Shallow Aquifer Investigation Study of Kailali District

November 1, 1991

Project duration: November 1991 – December 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…

Read more

Shallow Aquifer Investigation Study of Bardiya District

November 1, 1991

Project duration: November 1991 – December 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…

Read more

Shallow Aquifer Investigation Study of Kanchanpur District

November 1, 1991

Project duration: November 1991 – December 1991. Aquifer investigation surveys were carried out. Before the survey was conducted the elevation information and description of benchmarks covering the districts for this…

Read more

Micro Projects Facilitation and Supervision of Gulmi and Arghakhanchi Districts

November 1, 1991

Project duration: November 1991 – October 1992. This was Technical Assistance Project funded by the French Government. It was a multi-sectoral integrated rural development project implemented in Gulmi and Arghakhanchi…

Read more

Nepal Multimodal Containerization Project: Review and Update of 1990 Feasibility Report

December 1, 1991

Project duration: December 1991 – January 1992. Nepal being landlocked country, it feels the need of moderaisation of Nepal’s present transit traffic. One of the objectives of the study is…

Read more

Financial and Management Feasibility Study of Milk Producers Associations (MPA) Participation in Dairy Business

January 1, 1992

Project duration: January 1992 – May 1992. Under the agricultural development assistance program of the USAID to Nepal, the part of the funding was use to prepare “A Financial and…

Read more

Road Maintenance Program: Phase I A and B

May 1, 1992

Project duration: May 1992 – October 1995. The Project may be viewed as four separate but related parts in tow phases, with the common overall objective of introducing systematic and…

Read more

Formative Evaluation of Community Development Component Of K-BIRD Drinking Water and Irrigation Projects

May 1, 1992

Project duration: May 1992 – July 1992. This was an evaluation study of community development component of Drinking water and Irrigation project of Surkhet district. Main objective of the study…

Read more

Formation Evaluation Study of Women Literacy, Family Life and Income Generation Program

May 1, 1992

Project duration: May 1992 – July 1992. Declaration of UN for Women as “Intergation of Women in Development a Equal partner with Man” was the due realization to assess and…

Read more

Impact Evaluation Study of Karnali – Bheri Intergrated Rural Development (K-BIRD) Project

May 1, 1992

Project duration: May 1992 – July 1992. The overall goal of the Karnali-Bheri Integrated Rural Development Project (K-BIRD) was to increase and enhance self-initiated and sustainable economic, environmental and social…

Read more

Floodway/Bridge Design, Kohalpur-Mahakali Highway Project

July 1, 1992

Project duration: July 1992 – April 1993. A study was carried out to determine the technical and economic feasibility of replacing 6 already constructed, and 8 proposed floodways structures on…

Read more

Road Maintenance: Policy Action Program Workshop

December 1, 1992

Project duration: December 1992 – February 1993. The Department of Roads (ROAD) of Ministry of Works and Transport assigned Economic Studies Group of Render Palmer and Triton from UK in…

Read more

Impact Study of Ceramic Promotion Project

January 1, 1993

Project duration: January 1993 – July 1993. SBPP/GTZ

Read more

Engineering Education Project IDA Credit No. 2044-NEP

February 1, 1993

Project duration:  February 1993 – December 1998. Goverment of Neepal Received a Credit from IDA inn various currencies towards the cost of the Engineering Education Project. In this respect the…

Read more

Rural Drinking Water and Sanitation Feasibility Study (Development Phase) – I Traunche

December 1, 1993

Project duration: December 1993 – April 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a “learning by doing” activity…

Read more

Rural Drinking Water Supply and Sanitation Programme

December 1, 1993

Project duration: December 1993 – September 1994. The Rural Water Supply and Sanitation Field-Testing Project, otherwise known as the JanataKoKhanePani Ra SafaiKaryakram (JAKPAS) Project, is a