Project Duration: 1 April, 2013 – 1 May, 2014.

Construction Supervision of Choir – Sainshand (35th Railway Crossing) Road Project LoT-2 (KM90 to KM 176.4) 86.4 KM and addtional 2.8KM linked road at Airag (1.7KM) & 1.1KM at Dalangaral, To review construction drawings in advance of the works. To ensure that the Contractor is informed of any deficiency in his execution of the construction work, to ensure the safety of the public by regularly check in and monitoring the Contractor’s traffic management arrangements and to promote safe working conditions for all staff and operatives engaged on the contract, To watch over the execution of construction work to ensure compliance with the drawings, specifications and safety and Environmental provisions, To inform the Contractor in respect of any deficiency in the execution of the construction work. To carry out measurement checks and testing as instructed by the Resident Engineer as appropriate to ensure the accuracy of the works. To maintain daily records of all activities being carried out in the section of works under his control, to maintain daily records of weather conditions, to assist the Quantity Surveyor in the measurement and recording of the works. To check, when appropriate the setting out of the works, to organize and supervise the inspection of the execution of construction work to ensure compliance with the drawings, specifications, safety and environmental provisions. To ensure that measurement checks and testing to ensure the accuracy of the works are carried out, to ensure that the construction drawings are reviewed in advance of construction, to check the Contractor’s method statements. To check the Contractor’s as-built drawings. To ensure that the Contractor is informed of any deficiency.