Project duration: October 1988 – 1990
The services provided were: Topographic survey, traffic studies, hydrological study, geo-technical investigations, and socio-economic analysis including engineering survey and cost estimate.
The assignment was conducted in two phase, phase I included feasibility investigation field survey, data collection analysis recommendation etc. UNDP/IBRD