Project duration: November 1988 – March 1989.

Assist Canadian Corporation Office (CCO) Kathmandu in survey, design, cost estimate, preparation of tender documents, bid evaluation, construction, monitoring and supervision works of CMA Campus complex and other six health posts around Dhankuta district.

The remedial works of campus buildings, construction and improvement of drinking water system, access road upgrading (black toping and drainage) including structural design, construction of concrete bridge, river training and erosion control works were carried out.

While constructing the above building and facilities standard construction norms and criterias were strictly  followed so that the environment of the area are maintained.CIDA/Nepal