Project duration: September 1986 – September 1986.
The study was done for Winrock International to investigate and recommend the existing power supply system in Rampur agriculture Campus and Parwanipur Agriculture (Section) Campus.
Project duration: September 1986 – September 1986.
The study was done for Winrock International to investigate and recommend the existing power supply system in Rampur agriculture Campus and Parwanipur Agriculture (Section) Campus.
Recent Comments