Project duration: February 1989 – August 1989.
This is a detailed survey and design work of about 6.0 km of the Terai Road in the existing Tea Garden of the area.
Project duration: February 1989 – August 1989.
This is a detailed survey and design work of about 6.0 km of the Terai Road in the existing Tea Garden of the area.
Recent Comments