Project duration: February 1991 – March 1991.

This was an appraisal survey of the two HMG funded schemes managed by the local people. The main objectives of the appraisal survey was to proposed if the detail survey and design of the project could be prepared for further development and extension for better economic sectors prosperity of the local people.