Project Duration: September 2006 – October 2007. 

The overall objective is to identify major environmental issues associated with the proposed project such as:

-To reveal positive and negative consequences of the project to decision makers and other interested parties,

-To provide environmental background information that makes it possible to design, construct and operate the road in an environmentally feasible way and to provide possible adaptive measures.